National Museum of the Marine Corps, Exhibit Lighting, Phase 1

Location:

Quantico, VA

General Contractor:

G-W Management Services, LLC

Complete electrical renovation including replacement of 14 lighting control panels with branch lighting panels, removed incandescent and installed LED fixtures in a large majority within galleries 1,4,5,6,7,8,10,11 and 12. Scope also included removing the fixtures in approximately 37 display cases and replaced them with LED's while working closely with the museum curators. Gallery 1 required the use of a 148' lift which was operated within the building to replace the fixtures in the atrium. Difficulties included working around museum artifacts and large military equipment and aircraft which remained in place. Project successfully completed on time with no safety issues or exhibit damages. Aarow Electrical Solutions was awarded a 2017 WBC craftmanship award for Lighting Systems.