top of page


NIH P2 FA/MN Upgrade
Location:
Bethesda, MD
General Contractor:
Westerly Enterprises
Installed full fire alarm systems in three multistory parking garages, concurrently installed fire alarm coverage in 6 miles of below ground tunnels. In addition, Aarow installed campus wide fire alarm mass notification on the exterior of twelve buildings strategically placed throughout the campus. To achieve this scope Aarow teamed up with Simplex/ JCI and tied into the existing campus network.
bottom of page